Wednesday, September 15, 2010

And the inspections roll on.

I took some snaps while we were waiting for some of the inspections to show how things are looking. On the left here we have the lovely retail area, and where the lovely pasties will be baked. The infamous warm display unit is now in place and I'm getting to like it now. Paul the architect likes it, but is still complaining about my acquisition of an old Quiznos open air merchandiser. I had to save money for that superb Vulcan oven in the corner, they don't come better than that beast. The hood above the oven and now all the air conditioning mechanicals have passed the final inspections so we breath a big sigh of relief.
Also you can see the drinking fountains are in place,
these were delaying the final plumbing inspection
but that is now all completed.
Then we are now hung up on the electrical inspection. We had been calling for final inspection all last week with no response. On Tuesday they came, but it appears we have to change some sockets to contain their own circuit breakers. That work was done immediately, we had to sit it out through Wednesday, and then today we got the little signed sticker.
Just as the electrics were all signed off, the Health Dept person arrived. Annette is great to work with, and all our work met with her approval :-) So today was a very good day.
It's not all over yet though, we have the buildings inspector to come tomorrow (Friday) and then the Fire Marshall. Both vital and important.

Anyway, on the right is the beautiful open kitchen, may it always stay in this wonderful state.
Except full of pasties being stuffed with gorgeous organic goodies.